Ja-Co Welding

industrial

This large building consists of a welding shop as well as offices and required mechanical services for both of these very diverse environments. During welding, not only does proper ventilation contribute to a more comfortable working space but also is vitally important for employee health. Hazardous gases that result from welding must be properly removed from the workspace for safety.

An in-floor heating system was designed for the primary shop area. In addition to the shop area, a mechanical system for the office space was designed including services such as plumbing and ventilation as well as associated services such as natural gas piping design.

Efficient equipment combined with an efficient design reduces utility costs as well as minimizes a buildings carbon footprint which is evident in this modern industrial building.