Telus Bonnie Doon
ES Engineering was retained by TELUS as prime consultant to replace the old, inefficient cooling units with rooftop units. A large challenge was that a certain amount of cooling was to be maintained in the building during the project. This requirement demanded simultaneous removal and installation of equipment to minimize disturbing the cooling load as much as possible. As well, just like any project, precise coordination and communication was vital between all active parties.