Telus Grande Prairie Toll Building


Supply Fan Replacement

This project was to replace the existing supply air fans installed in the cold deck section of the air handling unit. Work included demolition and removal of the existing supply air fans, expansion of existing access door to accommodate new fans, installation of new fans, modifications to the existing air handling unit casing to suit and the removal of existing cold deck humidifiers.

HVAC Review

ES Engineering was retained by TELUS to review and evaluate the present HVAC systems and equipment, heating and cooling demand as well as existing mechanical controls systems and N+1 Redundancy and to provide options for upgrading the mechanical systems for the Toll Building.

New Air Conditioners

ES Engineering as prime consultant was hired to design new split system air conditioners for Toll Building. The new air conditioners with condensers located outside of the building were installed to help cool down the equipment rooms.