West End Medical & Professional Centre
institutional
ES Engineering was assigned to replace an existing chiller and to upgrade the existing piping system for the West End Medical and Professional Centre in Edmonton, AB. This included the selection of new equipment, preparation of tender documents, review of shop drawings, and project administration.