Rice Howard Parkade Boiler and MAU Replacement
commercial
The project was at the Rice Howard Way Parkade and consisted of replacing the existing natural gas fired steam boiler with a new natural gas fired high efficiency non-condensing boiler. The heating system was converted from a steam to a glycol system.